Sign In | Join Free | My himfr.com
Home > Dummy Load Bank >

Emergency Stop Dummy Load Bank Grey With 1650 Mm * 1350 Mm * 1680 Mm Size

Hebei Kaixiang Electrical Technology Co., Ltd
Contact Now
    Buy cheap Emergency Stop Dummy Load Bank Grey With 1650 Mm * 1350 Mm * 1680 Mm Size from wholesalers
     
    Buy cheap Emergency Stop Dummy Load Bank Grey With 1650 Mm * 1350 Mm * 1680 Mm Size from wholesalers
    • Buy cheap Emergency Stop Dummy Load Bank Grey With 1650 Mm * 1350 Mm * 1680 Mm Size from wholesalers
    • Buy cheap Emergency Stop Dummy Load Bank Grey With 1650 Mm * 1350 Mm * 1680 Mm Size from wholesalers

    Emergency Stop Dummy Load Bank Grey With 1650 Mm * 1350 Mm * 1680 Mm Size

    Ask Lasest Price
    Brand Name : Kaixiang
    Model Number : AC380V-600kW
    Certification : ISO9001
    Price : negotiable
    Payment Terms : L/C, T/T, Western Union
    Supply Ability : 30 Sets / Month
    Delivery Time : Within 42 working days
    • Product Details
    • Company Profile

    Emergency Stop Dummy Load Bank Grey With 1650 Mm * 1350 Mm * 1680 Mm Size

    AC380V-600kW Dummy Load Bank With 60 HZ And 1650mm*1350mm*1680mm

    Introduction

    Triumph load are available in stationary type for permanent installation or portable type with fork lift pocket base, castors. Larger load banks, are based on an ISO container construction. Special finishes including custom paint colors and stainless steel casings can be supplied.

    AC380V-600kW Dummy Load Bank can simulate the real working conditions and provides a rigorous test regime for power supplies from 1kW to 60MW. Resistive, inductive(reactive),capacitive or combined load banks can be customised for any application.

    Load banks can be supplied for most powers, voltages, frequencies and sizes. Multi-voltage load banks are also available for operation over a large voltage range. At the same time, It can operate in parallel with more than two units.

    Application

    1. Battery system testing

    2. Load optimization in prime power applications

    3. Factory tesT of turbines

    4. factory test of engine generator sets

    5. To reducewet stacking problems

    6. Periodic excercising of stand-by engine generator sets

    Technical specification

    Technical Parameters
    Rating Voltage/FrequencyAC 380V/50Hz, 3 phase 4 Line
    Max Load PowerResistive Load: 600kW
    Load StepResistive Load:11 steps; 1,2,2,5,10,10,20,50,100,200,200kW
    Power Factor1
    Load Tolerance(each step)±5%
    Load Tolerance(overall)±3%
    Display Precision0.5 class
    Control Power SupplyExternal 380VAC, 3phase 4wire 50Hz,
    Wire Connection

    Load Power Supply Input——Copper bar (star connection)

    Control power supply input——Wiring row

    Communication InterfaceRS485, RS232
    Insulation ClassF
    Working ModeContinuous Working
    CoolingForced air cooling,Horizontal inlet air,Horizontal outlet
    TransportationHoisting, there are lifting lug in top of case and wheel castors in bottom
    ColorOrange(RAL2008)
    Dimension

    Approximately; 1650mm*1350mm*1680mm

    (Width *Length *Height)

    Operating Environment Parameter
    Ambient Temperature-10℃~+50℃
    Relative Humidity≤95%
    Altitude≤2500 meters
    Atmospheric Pressure86~106kPa
    Main features

    (1) Overheat Alarm Indicator:When the unit is overheating, the corresponding warning lights up, load bank gives alarm.

    (2) Over-voltage Alarm Indicator:When load bank is under over-voltage protection, the corresponsive light turns on and gives alarm.

    (3) Temperature Display: display real time temperature.

    (4) Measuring meter: display testing data.

    (5) Control mode selector switch: [Local] use panel switch manually operated,and point to [Intelligent] can be operated via PC software. Two methods are mutually exclusive modes of operation; please make sure the current operation mode is in accordance with the corresponding mode.

    (6) Fan Power Supply: push the button, the indicator lights up, fans will work.

    (7) Load Confirm: Master load switch, when the switch is pressed, the yellow indicator lights up, load bank will load / unload according to a preset power loading.

    (8) Emergency stop: In case of emergency, press this switch, immediately stop loading. After resolving the emergency problem, clockwise rotary switch, unlock, continues to load.

    (9) Power setting switch: totally 16 switches:1,2,2,5,10,10,20,50,100,100,200,200,200,200,200,200kW press the corresponding switches, and press the < Load Confirm >.

    (10) Fault: red fault indicator lights up, and with alarm, the load bank will be in protection.

    Quality Emergency Stop Dummy Load Bank Grey With 1650 Mm * 1350 Mm * 1680 Mm Size for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Hebei Kaixiang Electrical Technology Co., Ltd
    *Subject:
    *Message:
    Characters Remaining: (0/3000)